Medulin Munida Street Buildings 1 and 2 are the first two, out of a total of 5 smaller buildings that will be located in Medulin in Munida Street, below the street, only five hundred meters from Plodine. Buildings 1 and 2 together form one whole, a smaller block in which each of the buildings has several apartments, which is an advantage for those who prefer smaller buildings with fewer neighbors. Advantages that are definitely worth mentioning are the proximity of kindergartens and schools, as well as several larger stores. Each apartment comes with a parking space, and each apartment is air conditioned.
- Square meters : 43-108m2
- Construction completion deadline : 2022

Close to public transport

Parking place

Air conditioning

Project Timeline
12/2020 – Beginning of preparatory works on the land, formation of the border wall
09/2021 – Completion of the first floor of Building E, concreting of the slab
09/2021 – Completion of the first floor of Building E, concreting of the slab
09/2021 – Works on foundations
09/2021 – Base plate casting
10/2021 – Ground floor construction
10/2021 – Completion of ground floor erection
10/2021 – Raising the first floor
11/2021 – Completion of the first floor
11/2021 – Concreting of the first floor slab
12/2021 – Raising the second floor
12/2021 – Completion of the second floor
12/2021 – Completion of construction of buildings 1 and 2
01/2022 – Construction of buildings 1 and 2 completed
03/2022 – Installation of PVC joinery on buildings 1 and 2
05/2022 – Works on the first phase of installations
09/2022 – Start of installation of insulation
10/2022 – Installation of insulation
10/2022 – Completion of insulation work
11/2022 – Works on the facade and painting of the facade
01/2023 – Interior works
04/2023 – Works on concrete surfaces
05/2023 – Works on the garden
06/2023 – Completion of works on concrete surfaces
08/2023 – Installation of ceramics
09/2023 – Laying stone in the staircases