Stinjan Varos 1 and 8
Buildings Štinjan Varoš 1 and 8 are part of our project for the construction of a residential complex in Štinjan, in a beautiful position right next to the greenery, and a sea view from the first floor. It is a complex of 8 residential buildings, which are arranged in blocks of two buildings. Each building has 3 to 4 apartments which is an advantage for those who like smaller buildings, with fewer apartments.
- Square meters : 45-92m2
- Construction Completion Deadline : 2021

Close to the sea

Close to public transport

Parking place

Air conditioning

Project Timeline
06/2020 – Beginning of preparatory work on the ground
07/2020 – Start of construction of the Building 1
08/2020 – Raised ground floor, preparations for the construction of the first floor of Building 1
09/2020 – Raised first and second floor of Building 1, preparations for raising the attic. Beginning of preparatory earthworks on Building 8.
10/2020 – Attic erected, erection of the Building completed 1. Completion of preparatory earthworks on the Building 8.
11/2020 – Installation of PVC joinery on Building 1
11/2020 – Raising the ground floor of the Building 8
12/2020 – Erection of the first floor of the Building 8
12/2020 – Pouring the concrete slab of the first floor, preparations for raising the second floor
01/2021 – Erection of the second floor of the building 8
02/2021 – Works on the roof of the Building 8
03/2021 – Completion of works on the roof of the Building 8
04/2021 – Plastering of apartments in Building 1, installation works of Building 8
05/2021 – Installation of PVC joinery on Building 8
06/2021 – Painting of apartments in the building 1
07/2021 – Installation of ceramics in building 1, preparations for the beginning of plastering in building 8
07/2021 – Installation of insulation on Building 1
08/2021 – Completed installation of insulation on the building 1
09/2021 – Silicate is applied to Building 1
09/2021 – Painting the facade of the Building 1
09/2021 – Installation of insulation on Building 8
10/2021 – Painting the facade of the Building 8
10/2021 – Works on concrete substrates of the Building 8
11/2021 – Finished painting of the facade on Buildling 8
12/2021 – Start of work on the fence wall
01/2022 – Works on the fence wall and decoration of the entrance hall
02/2022 – Arrangement of parking spaces and the driveway